Daewoo Nexia

Since 1994 of release

Repair and car operation



Дэу the Nexia
+ The maintenance instruction
+ Maintenance service
+ The engine
+ 3. The engine (two top camshafts)
+ Cooling system
+ Топлевная and exhaust systems
+ Electric chain
+ 7. Ignition system
+ 8. The electronic block of management and gauges
+ Transmission
+ 10. A five-speed transmission and the main transfer RPO MM5
+ 11. Automatic Transmission
+ Steering
+ Running gear
+ 14. A forward suspension bracket
+ 15. A drive of forward wheels
+ 16. A back suspension bracket
+ Brake system
+ Body
- Heating, ventilation
   19.2. Air central air
   19.3. Diagnostics of malfunctions
   19.4. Features of the conditioner
   19.5. Work of a central air of air
   + 19.6. Management of air central air
   19.7. The relay and switches
   + 19.8. Diagnostics of malfunctions
   - 19.9. Maintenance service
      19.9.1. Replacement of sealing rings
      19.9.2. Rules of the reference with a coolant
      19.9.3. Rules of installation of connections of pipelines
      19.9.4. Maintenance of chemical cleanliness of a coolant and refrigerating oil
      19.9.5. A discharge, having added oils, откачка air, gymnastics of system KV a coolant
      19.9.6. Filter-vlagopoglotitelja installation
      19.9.7. Receiver maintenance service
   + 19.10. Removal and installation of knots of a central air of air
   19.11. Compressor V-5 – the work description
+ Electric equipment






19.9. Maintenance service
THE GENERAL DATA

Elements of system KB and the scheme of a stream of a coolant

AND. THE PRESSURE HEAD PIPELINE – THE STREAM OF COMPRESSED HOT STEAMS OF THE COOLANT
CENTURY THE STREAM OF COOLANT R-12
WITH. THE SOAKING UP PIPELINE – THE STREAM OF COLD STEAMS
COOLANT UNDER LOW PRESSURE
D. THE LIQUID PIPELINE - THE STREAM LIQUID HOT
COOLANT UNDER THE HIGH PRESSURE
Е. THE TECHNOLOGICAL UNION IN THE HIGH PRESSURE CONTOUR
F. THE TECHNOLOGICAL UNION IN THE CONTOUR OF LOW PRESSURE

1. THE COMPRESSOR
2. THE CONDENSER
3. THE EVAPORATOR
4. THE RECEIVER
5. THE THROTTLE BRANCH PIPE
6. РЕДУКЦИОННЫЙ THE VALVE
7. THE SWITCH OF LOW PRESSURE

Before starting carrying out of servicing of system KB connected with демонтажем of pipelines or knots of system, it is necessary to familiarise with corresponding paragraphs of the present section in detail. At servicing of system of KB and its knots it is necessary to be guided strictly by the instructions resulted more low on a discharge and a gymnastics of system a coolant, доливу oils etc. should be removed Safety covers from unions of units of system KB only directly ahead of installation. At installation connected details grease with pure refrigerating oil of mark 525 if the system is filled хладаген volume R-12, or oil PAG in case of use of coolant R-134a. At assemblage it is authorised to use only new sealing rings of round section which preliminary dip into capacity with pure refrigerating oil: accordingly marks 525 or PAG depending on the used mark of a coolant. Greasing facilitates assemblage and helps to provide tightness of connection. At an inhaling of carving connections it is necessary to use the second wrench for deduction of a motionless detail. Only so it is possible to provide density of a joint and correct assemblage.

The definitive tightening штуцерных connections of pipelines should be made according to the inhaling moments. Insufficient or too strong inhaling of connections can lead accordingly to leaky connection or deformation of details. In both cases coolant leaks are possible.